Some preliminary considerations for a minimal basic vertical
launch system project:
- vertical launch gantry -> preferably located in dry,
moderate, low wind context
- steel includes corrosion treated checker plate, HSS,
channel, plus I-Beam with basic architectural layout, cut and weld
- gantry mounted on tracks with fine position control
- module lift crane or frame for lifting launch vehicles or subunits
into place with fine control capability
- stabilizer swing arm or frame for each launch vehicle subunit,
adjustable position and radius for model variation
- modular scaffolding with safety system for detail work
- plumbing with underground storage tanks and cooling systems for liquid
oxidizer, liquid green fuel, liquid nitrogen
- rapid fire suppression system with non toxic flood
mode
- wide area reinforced concrete base with exhaust exit
channels (hardened with steel and epoxy resin)
- adjustable metal and hardened concrete mounting ring for base of bottom
launch vehicle subunit
- docking bays for contractor supply vehicles
- high current electrical supply with heat resistant
casing
- launch gantry cameras, lights, safety & weather
sensors & security monitors
- optical fibre network connections for gantry subsystems
and launch vehicle preparation
- personnel and light subunit lift with safety cage
- underground personnel preparation rooms, emergency
surgery facility, washroom facilities
- underground storage facilities for miscellaneous items
and support vehicles
- launch preparation and monitor bunker
- gantry systems server array
- safety monitor server array
- navigation server array
- science instrument feedthrough server array
- launch vehicle final test server array
- communications server array
- visualization systems
- mass storage system with archiving for all launch activities
- see through sound proof divider(s)
- media cubicles with internet connection
- media rest area, washroom facilities
- staff rest area, washroom facilities
- underground storage facilities for miscellaneous items
and support vehicles
- hardened assembly hangar (preferably reasonably close to
launch gantry)
- final assembly and test area for contractor subassemblies
- floor space for batch assembly & test plus maneuver
room for crews
- receiving docks for delivery of heavy components
- dual overhead xyz tracking gantry robot with fine control
(access to receiving dock area)
- automated assembly server array
- module test systems
- inventory and subassembly tracking and accounting servers
- test fixtures and equipment storage area
- media tour walkway with safety cage
- staff rest area, washroom facilities
- storage facilities for miscellaneous items and support
vehicles
|